Contractor-priced
0870T · PFS Q4 2025 · Historical
No national PFS rate in Q4 2025
Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.
PFS status evidence
Inspect PFS status evidence
- Code
- 0870T
- Release
- Q4 2025, revision 1
- Result
- Contractor-priced
Citations
-
Shows this code’s PFS status (C). Result: Contractor-priced.
Physician relative value file (PPRRVU)CMS RVU25DOctober 1 – December 31, 2025
This PFS record alone does not establish a $0 allowance or a coverage determination. Any amount from another schedule needs its own evidence.
PPRRVU2025_Oct.csv row 903 in rvu25d-updated-09-11-2025.zip
In the CMS file
Loading rows 901–905 of PPRRVU2025_Oct.csv…
Download rvu25d-updated-09-11-2025.zip from CMS File fingerprint
8af460f38bf982b79b07269fbc8b7256a8ef3bd3aa025a9c5cb71c1e52523c56
CPT 0870T has no published national rate. It carries status C (carrier-priced) in the Q4 2025 release. Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation. The blank amount means unpriced, not $0.
Why is there no national PFS amount for 0870T?
Its status indicator is C (carrier-priced). Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.
Which billing rules and modifiers apply? Copy link
CMS indicators that apply to 0870T: GLOB DAYS 000 (same day only) · MULT PROC 2 (standard reduction applies).
Same day only
GLOB DAYS
000
The fee covers pre-operative and post-operative work on the day of the procedure only—there is no follow-up window afterward. A visit the next day is separately payable.
Standard reduction applies
MULT PROC
2
When billed with other procedures on the same date, the highest-valued one is paid at 100% and the next four at 50% each.
-51 depends on the other codes on the same claim, so it's a claim-level number rather than a per-code one.
Why would a Medicare claim for 0870T be denied or paid less?
These come from CMS indicators on this page, not general billing advice.
- Its status indicator is C (carrier-priced)—Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation. See status indicators
- Bilateral surgery: no bilateral adjustment. See billing policy
- Assistant at surgery: never separately payable. See billing policy
- Co-surgeons: not permitted. See billing policy
- Team surgery: not permitted. See billing policy
- Multiple procedures: standard reduction applies. See billing policy
Payer-specific coverage and documentation rules live outside these files, so a claim that clears every check here can still be denied on other grounds.
CMS RVU25DOctober 1 – December 31, 2025
Can you bill it with another code? Copy link
Reconciling a contractor-priced payment for 0870T Copy link
What to check (5)
There is no national allowed amount for 0870T, so every reconciliation of this line runs against the MAC fee schedule that was in force for the date of service rather than against a national baseline.
- Compare the paid amount against the MAC fee schedule in force for the date of service; there is no national allowed amount here to reconcile against.
- Check the visit date: this code carries no follow-up window, so a related visit the day after the procedure is separately payable and should not have bundled.
- Rank the claim’s procedure lines before calling a reduced line short-paid—under the standard multiple-procedure rule only the highest-valued one prices in full.
- Expect an assistant-at-surgery denial here rather than appealing it—a -80 or -AS line on this procedure is never separately payable.
- Reprice the line against the release, locality, setting, modifier and participation status that applied to the date of service before treating any difference as an underpayment.
Sources: CMS Medicare Physician Fee Schedule Relative Value Files; CMS Medicare Physician Fee Schedule Relative Value Files (status indicator field); CMS Medicare Claims Processing Manual (Pub. 100-04); 42 USC 1395w-4(i)(2) (SSA §1848(i)(2))—Assistants-at-surgery.
Source & method Copy link
The PFS file shows this code is priced by the contractor. Its amounts come from the MAC-published schedules and effective dates shown above.
-
01 PPRRVU2025_Oct.csv · Q4 2025 (RVU25D) · row 903—priced by the contractor
- Effective
- October 1 – December 31, 2025
- Locator
- PPRRVU2025_Oct.csv in rvu25d-updated-09-11-2025.zip · row 903 of 19,090 · via CMS
- Fields read
-
Status C (col 4)SHA-256 8af460f38bf982b7…
Cite this rate
CPT 0870T National PFS baseline: No national PFS rate (Q4 2025; participating physician; whole service; GPCI 1.000; sequestration excluded). CMS RVU25D, PPRRVU2025_Oct.csv row 903. Localis. https://localishealth.com/cpt/0870T/2025/D
Past releases are never edited, so the citation stays checkable after CMS publishes a newer one. Methodology · Plain-text summary · JSON
How has it changed? Copy link
When does this rate change?
CMS publishes a fee schedule release every quarter (January, April, July, October), and each is versioned here. See what changed each release, or get an email when a new release moves rates.
Sources: CMS Medicare Physician Fee Schedule Relative Value Files.
Did this answer your question about CPT 0870T?
Tell us what you were trying to work out and we'll answer you or build the page that does.