localis

Type a CPT/HCPCS code, a place, a service in plain words, or a whole claim line like 90837 LCSW 94110.

Try

CPT 0816T Medicare payment status

Contractor-priced

0816T · PFS Q4 2025 · Historical

No national PFS rate in Q4 2025

Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.

View applicable payment rules

PFS status evidence

Inspect PFS status evidence
Code
0816T
Release
Q4 2025, revision 1
Result
Contractor-priced

Citations

  • Shows this code’s PFS status (C). Result: Contractor-priced.

    Physician relative value file (PPRRVU)CMS RVU25DOctober 1 – December 31, 2025

    This PFS record alone does not establish a $0 allowance or a coverage determination. Any amount from another schedule needs its own evidence.

    PPRRVU2025_Oct.csv row 835 in rvu25d-updated-09-11-2025.zip

    In the CMS file

    Loading rows 833–837 of PPRRVU2025_Oct.csv…

    Download rvu25d-updated-09-11-2025.zip from CMS File fingerprint 8af460f38bf982b79b07269fbc8b7256a8ef3bd3aa025a9c5cb71c1e52523c56

Report a problem

CPT 0816T has no published national rate. It carries status C (carrier-priced) in the Q4 2025 release. Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation. The blank amount means unpriced, not $0.

Why is there no national PFS amount for 0816T?

Its status indicator is C (carrier-priced). Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.

Which billing rules and modifiers apply? Copy link

CMS indicators that apply to 0816T: GLOB DAYS YYY (contractor decides) · MULT PROC 2 (standard reduction applies).

Global surgery period

Contractor decides

GLOB DAYS

YYY

Your Medicare Administrative Contractor decides whether a global period applies and sets its length when it prices the code. The result is 0, 10, or 90 days.

Multiple procedures

Standard reduction applies

MULT PROC

2

When billed with other procedures on the same date, the highest-valued one is paid at 100% and the next four at 50% each.

-51 depends on the other codes on the same claim, so it's a claim-level number rather than a per-code one.

Why would a Medicare claim for 0816T be denied or paid less?

These come from CMS indicators on this page, not general billing advice.

Payer-specific coverage and documentation rules live outside these files, so a claim that clears every check here can still be denied on other grounds.

CMS RVU25DOctober 1 – December 31, 2025

Can you bill it with another code? Copy link

This code

0816T

See every current NCCI pair for 0816T →

Reconciling a contractor-priced payment for 0816T Copy link

What to check (5)

There is no national allowed amount for 0816T, so every reconciliation of this line runs against the MAC fee schedule that was in force for the date of service rather than against a national baseline.

  • Compare the paid amount against the MAC fee schedule in force for the date of service; there is no national allowed amount here to reconcile against.
  • Ask the MAC which global period it assigned: the contractor sets the follow-up window for this code, so whether a post-operative visit should have paid depends on the contractor that priced it.
  • Rank the claim’s procedure lines before calling a reduced line short-paid—under the standard multiple-procedure rule only the highest-valued one prices in full.
  • Check for documentation on file before appealing an assistant-at-surgery denial: payment on the -80 or -AS line is restricted for this procedure unless medical necessity is established.
  • Reprice the line against the release, locality, setting, modifier and participation status that applied to the date of service before treating any difference as an underpayment.

Sources: CMS Medicare Physician Fee Schedule Relative Value Files; CMS Medicare Physician Fee Schedule Relative Value Files (status indicator field); CMS Medicare Claims Processing Manual (Pub. 100-04); 42 USC 1395w-4(i)(2) (SSA §1848(i)(2))—Assistants-at-surgery.

Source & method Copy link

The PFS file shows this code is priced by the contractor. Its amounts come from the MAC-published schedules and effective dates shown above.

  1. 01 PPRRVU2025_Oct.csv · Q4 2025 (RVU25D) · row 835—priced by the contractor
    Effective
    October 1 – December 31, 2025
    Locator
    PPRRVU2025_Oct.csv in rvu25d-updated-09-11-2025.zip · row 835 of 19,090 · via CMS
    Fields read
    Status C (col 4)
    SHA-256 8af460f38bf982b7…

Cite this rate

CPT 0816T National PFS baseline: No national PFS rate (Q4 2025; participating physician; whole service; GPCI 1.000; sequestration excluded). CMS RVU25D, PPRRVU2025_Oct.csv row 835. Localis. https://localishealth.com/cpt/0816T/2025/D

Past releases are never edited, so the citation stays checkable after CMS publishes a newer one. Methodology · Plain-text summary · JSON

How has it changed? Copy link

When does this rate change?

CMS publishes a fee schedule release every quarter (January, April, July, October), and each is versioned here. See what changed each release, or get an email when a new release moves rates.

Sources: CMS Medicare Physician Fee Schedule Relative Value Files.

Did this answer your question about CPT 0816T?

Tell us what you were trying to work out and we'll answer you or build the page that does.

Did this page answer your question?