localis

Type a CPT/HCPCS code, a place, a service in plain words, or a whole claim line like 90837 LCSW 94110.

Try

CPT 0519T Medicare payment status

Contractor-priced

0519T · PFS Q4 2019 · Historical

No national PFS rate in Q4 2019

Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.

View applicable payment rules

PFS status evidence

Physician relative value file (Q4 2019) · rvu19d.zip (PPRRVU19_OCT.csv row 5,394)
Inspect PFS status evidence
Code
0519T
Release
Q4 2019, revision 1
Result
Contractor-priced

Citations

  • Shows this code’s PFS status (C). Result: Contractor-priced.

    Physician relative value file (PPRRVU)CMS RVU19DOctober 1 – December 31, 2019

    This PFS record alone does not establish a $0 allowance or a coverage determination. Any amount from another schedule needs its own evidence.

    PPRRVU19_OCT.csv row 5,394 in rvu19d.zip

    In the CMS file

    Loading rows 5,392–5,396 of PPRRVU19_OCT.csv…

    Download rvu19d.zip from CMS File fingerprint 4efa7bdbffa98a56affa6d5b05e25d7ac5c39f26c7b281d0c773e7e530767cae

Report a problem

CPT 0519T has no published national rate. It carries status C (carrier-priced) in the Q4 2019 release. Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation. The blank amount means unpriced, not $0.

Why is there no national PFS amount for 0519T?

Its status indicator is C (carrier-priced). Your Medicare Administrative Contractor prices this code case by case, usually after reviewing documentation.

Which billing rules and modifiers apply? Copy link

CMS indicators that apply to 0519T: GLOB DAYS YYY (contractor decides) · MULT PROC 2 (standard reduction applies).

Global surgery period

Contractor decides

GLOB DAYS

YYY

Your Medicare Administrative Contractor decides whether a global period applies and sets its length when it prices the code. The result is 0, 10, or 90 days.

Multiple procedures

Standard reduction applies

MULT PROC

2

When billed with other procedures on the same date, the highest-valued one is paid at 100% and the next four at 50% each.

-51 depends on the other codes on the same claim, so it's a claim-level number rather than a per-code one.

Why would a Medicare claim for 0519T be denied or paid less?

These come from CMS indicators on this page, not general billing advice.

Payer-specific coverage and documentation rules live outside these files, so a claim that clears every check here can still be denied on other grounds.

CMS RVU19DOctober 1 – December 31, 2019

Can you bill it with another code? Copy link

This code

0519T

See every current NCCI pair for 0519T →

Reconciling a contractor-priced payment for 0519T Copy link

What to check (5)

There is no national allowed amount for 0519T, so every reconciliation of this line runs against the MAC fee schedule that was in force for the date of service rather than against a national baseline.

  • Compare the paid amount against the MAC fee schedule in force for the date of service; there is no national allowed amount here to reconcile against.
  • Ask the MAC which global period it assigned: the contractor sets the follow-up window for this code, so whether a post-operative visit should have paid depends on the contractor that priced it.
  • Rank the claim’s procedure lines before calling a reduced line short-paid—under the standard multiple-procedure rule only the highest-valued one prices in full.
  • Expect an assistant-at-surgery denial here rather than appealing it—a -80 or -AS line on this procedure is never separately payable.
  • Reprice the line against the release, locality, setting, modifier and participation status that applied to the date of service before treating any difference as an underpayment.

Sources: CMS Medicare Physician Fee Schedule Relative Value Files; CMS Medicare Physician Fee Schedule Relative Value Files (status indicator field); CMS Medicare Claims Processing Manual (Pub. 100-04); 42 USC 1395w-4(i)(2) (SSA §1848(i)(2))—Assistants-at-surgery.

Source & method Copy link

The PFS file shows this code is priced by the contractor. Its amounts come from the MAC-published schedules and effective dates shown above.

  1. 01 PPRRVU19_OCT.csv · Q4 2019 (RVU19D) · row 5,394—priced by the contractor
    Effective
    October 1 – December 31, 2019
    Locator
    PPRRVU19_OCT.csv in rvu19d.zip · row 5,394 of 17,046 · via CMS
    Fields read
    Status C (col 4)
    SHA-256 4efa7bdbffa98a56…

Cite this rate

CPT 0519T National PFS baseline: No national PFS rate (Q4 2019; participating physician; whole service; GPCI 1.000; sequestration excluded). CMS RVU19D, PPRRVU19_OCT.csv row 5,394. Localis. https://localishealth.com/cpt/0519T/2019/D

Past releases are never edited, so the citation stays checkable after CMS publishes a newer one. Methodology · Plain-text summary · JSON

How has it changed? Copy link

When does this rate change?

CMS publishes a fee schedule release every quarter (January, April, July, October), and each is versioned here. See what changed each release, or get an email when a new release moves rates.

Sources: CMS Medicare Physician Fee Schedule Relative Value Files.

Did this answer your question about CPT 0519T?

Tell us what you were trying to work out and we'll answer you or build the page that does.

Did this page answer your question?